Cover visual describing POSM Fabrication Sync Lab

Field execution

POSM Fabrication Sync Lab

We translate calendar milestones into fabrication-ready cut sheets, rigging notes, and retailer-specific restrictions. The lab tracks approvals so nothing ships before structural constraints are acknowledged.

  • Duration: 4-week sprint per wave
  • Format: Studio fabrication desk
  • Allocation band: ₩5,800,000
  • Channel: Hypermarket partners
  • Region focus: Nationwide
Request scope conversation

Inside the package

  • Vendor-ready Illustrator starter files per fixture type
  • Clearance matrices for elevator and loading docks
  • Language QA pass for Hangul + English dual signage
  • Install rehearsal checklist with torque guidance
  • Damage reporting workflow with photo taxonomy
  • Version locking once fabrication begins
  • Archive bundle for repeat seasonal reuse

Outcomes teams cite

  1. Fewer last-minute reprints caused by measurement drift
  2. Install crews arrive with materials matched to each store grade
  3. Transparent decision log when retailers reject proposals
Portrait avatar for Eun Kim

Lead partner · Eun Kim

POSM coordinator bridging structural engineers and retail standards officers.

Field notes from teams

POSM Fabrication Sync Lab ended the weekly mystery of which backdrop fit Lotte versus Emart ceilings.

Theo · Brand operations · 5/5 pulse

Transparent limitation: rush installs still hurt—this package reduces chaos, not physics.

Client in consumer electronics

Clarifications